Project Title |
Anticipated Solicitation Date |
Anticipated Purchasing Contact |
|
Asphalt Materials |
November 2008 |
Sherita Calloway |
| Asphalt Materials |
November 2008 |
I. Missy Jones |
| Construction Manager At Risk for Construction of Deicing Fluid Force Main - Phase II |
November 2008 |
Sherita Calloway |
| Copier Maintenance Program |
November 2008 |
I. Missy Jones |
| Financial Advisory Services |
November 2008 |
Veronica Caston-Frost |
| Janitorial Services Willow Run Aiport |
November 2008 |
I. Missy Jones |
| Landscape Maintenance Services |
November 2008 |
Sherita Calloway |
| OSHA Mandated Medical Requirements |
November 2008 |
Sherita Calloway |
| Parking Management |
November 2008 |
Sherita Calloway |
| Professional Services Engineering For Runway and Taxiways |
November 2008 |
Sherita Calloway |
| Public Relations and Marketing Services |
November 2008 |
I. Missy Jones |
| Runway Safety Improvements - Part III |
November 2008 |
Sherita Calloway |
| Website Design Services |
November 2008 |
Veronica Caston-Frost |
| Blue Deck Emergency Lighting (Rebid) |
December 2008 |
Sherita Calloway |
| Bridge Registration / Repair Alternatives |
December 2008 |
Christine Miller |
| Fuel Farm Improvements at Willow Run Airport |
December 2008 |
Veronica Caston-Frost |
| HVAC Air Filters |
December 2008 |
Veronica Caston-Frost |
| Magazine Storage Site Improvement |
December 2008 |
Sherita Calloway |
| On-Call Staffing and Technology Project Services |
December 2008 |
Veronica Caston-Frost |
| Rehabilitation of 9L/27R Runway and Taxiways |
December 2008 |
Sherita Calloway |
| Relocation of Water Main at Willow Run Airport |
December 2008 |
Sherita Calloway |
| Compensation Study |
Winter 2008/2009 |
Veronica Caston-Frost |
| Sand and Salt Spreader (V-Bottom) |
Winter 2008/2009 |
Veronica Caston-Frost |
| Computerized Project Management System |
January 2009 |
Sherita Calloway |
| Crack Sealing |
January 2009 |
Sherita Calloway |
| Design and Installation of Chilled Water BTU Metering |
January 2009 |
Christine Miller |
| Herbicide (Tri-Turf) |
January 2009 |
TBD |
| Old Steam Plant Evaluation / Upgrade |
January 2009 |
Christine Miller |
| On-Call Airfield Engineering and Related Services at Detroit Metropolitan and Willow Run Airports |
January 2009 |
Sherita Calloway |
| On-Call Landside Facilities/Infrastructure Engineering and Related Services |
January 2009 |
Sherita Calloway |
| On-Call Material Testing Services/Construction Oversight and Inspection |
January 2009 |
Sherita Calloway |
| On-Call Parking Lot Improvements |
January 2009 |
Christine Miller |
| Pavement Repair / Replacement Services |
January 2009 |
Christine Miller |
| Secure Ticket Sales Booking Engine Feature for Existing Airport Website |
January 2009 |
Veronica Caston-Frost |
| South Access Road North Tunnel Mechanical and Electrical Flood Related Repairs - Phase I |
January 2009 |
Christine Miller |
| Trash Removal Services |
January 2009 |
Sherita Calloway |
| Blue Deck Elevator Machine Room Improvements |
February 2009 |
Sherita Calloway |
| Fire Pump Upgrade at East Airfield Buildings (Design/Build) at Willow Run Airport |
February 2009 |
Sherita Calloway |
| Installation of Gas Line at Hangar #1 at Willow Run Airport |
February 2009 |
Sherita Calloway |
| Rehabilitation of Airport Service Drives - Phase I |
February 2009 |
Sherita Calloway |
| Repairs and Improvements to the South Access Road Retaining Wall Drainage System |
February 2009 |
Christine Miller |
| Roofing Replacement on Eight (8) Buildings |
February 2009 |
Christine Miller |
| Taxiway D Electrical Improvements at Willow Run Airport |
February 2009 |
Sherita Calloway |
| On-Call Planning and Support Services and Environmental Planning |
March 2009 |
Sherita Calloway |
| Tree Removal Services |
April 2009 |
Sherita Calloway |
| Construction of Intelligence Transportation System - Phase I |
May 2009 |
Sherita Calloway |
| Decommissioning of L.C. Smith Concourses A and B |
May 2009 |
Sherita Calloway |
| Energy Conservation Services (Design/Build) at Detroit Metropolitan and Willow Run Airports |
May 2009 |
Sherita Calloway |
| Reconstruction of Yellow Parking Lot |
June 2009 |
Sherita Calloway |
| Salvage Items at Building #278 |
June 2009 |
Sherita Calloway |
| Vehicle Driving/Training Facility |
June 2009 |
Sherita Calloway |
| Catch Basin Repair and Replacement |
Spring 2009 |
Christine Miller |
| Collection and Removal of Spent Deicing Fluid |
Spring 2009 |
Christine Miller |
| Outside Counsel for Federal Aviation Regulatory Legal Services |
Spring 2009 |
Christine Miller |
| Outside Counsel for Local General Legal Services |
Spring 2009 |
Christine Miller |
| South Access Road Tunnel Waterproofing and Draining Repairs |
Spring 2009 |
Christine Miller |
| Architectural and Engineering Services for Administration Building |
TBD |
Sherita Calloway |
| Concession Opportunity - Fixed Base Operator |
TBD |
Sherita Calloway |
| Elevator/Escalator/Moving Walkway Maintenance |
TBD |
Christine Miller |
| Elevator/Escalator/Moving Walkway Usage Audit Services |
TBD |
Christine Miller |
| Miscellaneous Pump Rental and Related Parts and Services |
TBD |
Christine Miller |
| On-Call Architectural/Engineering Services |
TBD |
Sherita Calloway |
| On-Call HVAC Mechanical Maintenance Services |
TBD |
Christine Miller |
| Upgrade to the Rogell Sanitary Sewage Lift Station |
TBD |
Christine Miller |
|   |
 
|
Last Updated 11/13/08 |
|
Do you see a project that would fit your company’s talents? Enter the MITN website to see if it is available yet. We look forward to doing business with you!
-The Wayne County Airport Authority Procurement Division- |